fair construction fair construction
Connect via

Works for the Construction of the High Commercial Court Building

 

 

CLIENT

Supreme Court. - P.O.Box 2197 - Kimihurura / Kigali

PROJECT NAME:

Proposed Construction works of a commercial court building.

 

 

 

WORKS COMPLEXITY:

Construction of a multi storeyed complex building with Stone masonry plinth walling, solid concrete blocks, reinforced concrete beams, slabs and columns, complex roofing in steel structure, Aluminium casement windows and doors, Lift installation, Painting works all electro-mechanical works, Massive excavation, external drainages, Parking, to mention a few.

 

 

Location : Nyamirambo, Kigali

Construction Works of Training Center Building for National Institute of Statisics of Rwanda (NISR)

CLIENT

NATIONAL INSTITUTE OF STATISTICS RWANDA (NISR)

PROJECT NAME:

Proposed Construction works of a Training Centre complex.

 

 

WORKS COMPLEXITY:

Construction of a multi storeyed complex building with and including underground floors solid concrete blocks, reinforced concrete beams, slabs and columns, complex roofing in steel structure, Aluminium casement windows and doors, Lift installation, Painting works all electro-mechanical works, Massive excavation, external drainages, Parking, to mention a few.

 


Location : Nyarugenge, Kigali

Civil Works for a 20.5 MW Thermal Power Project and Substation.


CLIENT

CONTOUR GLOBAL – Kibuye, Western Province, Rwanda.

PROJECT NAME:

Civil works related to the 20.5MW methane gas Power Supply Project – Rwanda.

 

 

WORKS COMPLEXITY:

Bulk excavation and rock blasting of more than 100,000cm of material, in preparation of platform for a 100MW methane gas project, construction of a marine landing site and soil erosion protection around the main power plant area.

 


Location : Kigali, Rwanda

RUSUMO CROSS BORDER MARKET.

 

 

CLIENT

RWANDA TRANSPORT DEVELOPMENT AGENCY (RTDA) – P.O.BOX 6674 –KIGALI

PROJECT NAME:

Execution works for the construction of a Cross Border at Rusumo in Kirehe District

 

 

 

WORKS COMPLEXITY:

Works included, design review of the entire project drawings, preliminary and temporary works, construction works for the Main building, ware house, cargo scanner, market, retail shops, bar and restaurant, Lodging Block, public toilets, fencing, land scapping, tarmacked parking, waste water treatment plant, street lighting and terrain drainage works


Location : KIREHE DISTRICT

Construction works for Kigali Cultural Village Phase One.

 

CLIENT

Rwanda Development Board. ( RDB)

PROJECT NAME:

Construction works for Kigali Cultural Village Phase One.

 

 

WORKS COMPLEXITY:

Construction of access roads, Master drainage system and water retention ponds, boreholes for irrigation, massive landscaping, auditoriums, massive car parking, premise fencings.


Location : Kicukiro District.

Hotel Vision

 

CLIENT

PARK INN by Radisson – Kigali.

PROJECT NAME:

Construction of a multi-storeyed Hotel Building.

C

 

WORKS COMPLEXITY:

Construction a multi storeyed Building for an executive hotel suit, in solid concrete blocks and reinforced concrete walls, slabs, columns and beams, parapet walling, aluminium windows and doors. All electro-mechanical works, Lift installation, external boundary walling, parking and landscaping. All painting and decoration works.e.t.c

 


Location : Kiyovu - Kigali

IPRC

CLIENT

Republic Of Rwanda – IPRC – Kigali.

PROJECT NAME:

Construction of the IPRC Kigali learning Centre and workshop.

 

 

WORKS COMPLEXITY:

Construction of a multi storeyed complex building with Stone masonry plinth walling, solid concrete blocks, reinforced concrete beams, slabs and columns, complex roofing in steel structure, Aluminium casement windows and doors, Lift installation, Ruliba brick work external finishing, Painting works all electro-mechanical works, Massive excavation, external drainages, Parking, to mention a few.

 


Location : Kicukiro, Kigali

RWANDA TEACHER'S TECHNICAL INSTITUTE AT KICUKIRO.

 

CLIENT

Republic of Rwanda , IPRC

PROJECT NAME:

Proposed Construction works of the Rwanda Teacher’s Technical Institute at Kicukiro.

 

 

WORKS COMPLEXITY:

Construction of classrooms and Dormitories in solid concrete blocks, reinforced concrete beams, slabs and columns, roofing in clay tiles, casement windows and doors, Painting works all electro-mechanical works, external drainages, Parking, to mention a few.


Location : KICUKIRO

Construction of Agahozo-Shalom Youth Village

CLIENT

AMERICAN JEWISH JOINT DISTRIBUTION COMMITTEE (USA)

PROJECT NAME:

Construction of a Multiple Dwelling Units and Associated Infrastructure.

 

 

WORKS COMPLEXITY:

Construction of 36 residential houses for 1000 learners, schools, carteen, Library, football and Basketball Fields. External infrastructure including electrical supply, roads, sewerage treatment system, water drainage system and Landscaping.

 


Location : Rwamagana - Rwanda

Construction of Lecture Blocks

 

CLIENT

KIGALI INSTITUTE OF TECHNOLOGY (KIST) MANAGEMENT - RWANDA

PROJECT NAME:

Construction of 3 five storeyed Lecture Blocks for Kigali Institute of Science and Technology. (KIST)

 

 

WORKS COMPLEXITY:

Construction 3 multi storeyed Buildings for institutional Lecture space, in solid concrete blocks and reinforced concrete walls, slabs, columns and beams, parapet walling, aluminium windows and doors. All electro-mechanical works, Lift installation, external boundary walling, parking and landscaping. All painting and decoration works. etc.

 

 


Location : Kigali - Rwanda

25MW Kivuwatt Methane Gas Power Project, Rwanda

 

CLIENT

WARTSILA FINLAND OY

PROJECT NAME:

25MW Kivuwatt Methane Gas Power Project, Rwanda.

 

 

WORKS COMPLEXITY:

Construction of Foundations for power house, utility blocks, stack, pump house, tank farm area, unloading station and fire water tank. All installations, exhausting gas duct supports etc. Construction of internal ring roads, all drainage works and Landscaping.

 


Location : Kibuye, Western Province, Rwanda

MUYANZA IRRIGATION PROJECT.

 

CLIENT

Ministry of Agriculture and Animal Resources. – P.O.Box 6961 – Kigali / Rwanda.

PROJECT NAME:

Proposed Construction works of 495 Ha Muyanza Irrigation System.

 

 

WORKS COMPLEXITY:

Pipe Networks, Hydraulic Structures, Regulating Reservoirs, Pressure reducing tanks, e.t.c and Implementation of Land-Husbandry Works(Terracing , waterways, check Dams, etc)


Location : RULINDO DISTRICT

Construction of Rwanda Revenue Authority Office Headquarters

 

CLIENT

MINISTRY OF FINANCE AND ECONOMIC PLANNING.

PROJECT NAME:

Construction of Rwanda Revenue Authority Office Building.

 

 

WORKS COMPLEXITY:

Construction of a6 and 4 storeyed Buildings for administrative offices, in solid concrete blocks and reinforced concrete walls, slabs, columns and beams, parapet walling, aluminium windows and doors. All electro-mechanical works, Lift installation, external boundary walling, parking and landscaping. All painting and decoration works. etc.


Location : Kigali - Rwanda

STUDIOTECH SA/NV, Houtweg 7; B-1130,Brussels Belgium

 

CLIENT

STUDIOTECH AUDIO – VISUAL ENGINEERING SA/NV BELGIUM.

PROJECT NAME:

TRANSFORMATION OF OBK INTO A BROADCASTING STATION.

 

 

WORKS COMPLEXITY:

Renovation of the Historic OBK Building to house the new ORINFOR Offices and studio premises.

 

 

 


Location : Kigali, Rwanda

Sahasra Electronics, Rwanda

 

CLIENT

SAHASRA ELECTRONICS.

PROJECT NAME:

Construction of Administration Block, ware houses and assembly plant.

 

 

WORKS COMPLEXITY:

Construction of a multi storeyed Building for commercial space, in solid concrete blocks and reinforced concrete walls, slabs, columns and beams, parapet walling, aluminium windows and doors. All electro-mechanical works, Lift installation, external boundary walling, parking and landscaping. All painting and decoration works. etc.


Location : Free Trade Zone, Kigali, Rwanda.

EXECUTION OF REHABILITATION OF KAZIBA-MUZO JANJA FEEDER ROAD. LOT 1

 

CLIENT

Gakenke District.

P.O.Box  Kigali-Rwanda,

PROJECT NAME:

Execution for Rehabilitation of Kaziba-Muzo-Janja Feeder Road

 Lot 1    (Janja-Muzo.Karama) in Gakenke District.


 

WORKS COMPLEXITY:

Clearing of undergrowth and cleaning of the influence, earthwork out of cut and fill, implementation of lateritic wearing course, work of drainage of rain water: side ditches out of ground or masonry, tubes, concrete pipe, pedestrian and vehicular slabs, masonry or gabion retaining walls, reinforcement concrete bridge & box culvert, vertical signalisation.


Location : GAKENKE DISTRICT.

EXECUTION OF REHABILITATION OF KAZIBA-MUZO JANJA FEEDER ROAD. LOT 2

 

CLIENT

Gakenke District.

P.O.Box   Kigali-Rwanda,

PROJECT NAME:

Execution for Rehabilitation of Kaziba-Muzo-Janja Feeder Road

 Lot 2    (Kaziba - Kararama) in Gakenke District.

 

 

WORKS COMPLEXITY:

Clearing of undergrowth and cleaning of the influence, earthwork out of cut and fill, implementation of lateritic wearing course, work of drainage of rain water: side ditches out of ground or masonry, tubes, concrete pipe, pedestrian and vehicular slabs, masonry or gabion retaining walls, reinforcement concrete bridge & box culvert, vertical signalisation.


Location : GAKENKE DISTRICT.

Construction of Multi-storey Commercial Building for BCDI - Bank of Commerce Development and Industry

 

CLIENT

COMMERCIAL BANK OF RWANDA (BCDI)

PROJECT NAME:

Construction of commercial Bank building.

 

 

WORKS COMPLEXITY:

Construction of 9 storeyed Building for administrative offices, in solid concrete blocks and reinforced concrete walls, slabs, columns and beams, parapet walling, aluminium windows and doors. All electro-mechanical works, Lift installation, external boundary walling, parking and landscaping. All painting and decoration works. etc.


Location : Kigali - Rwanda

Construction of Ministry of Finance and Economic Planning Headquarters

 

CLIENT

MINISTRY OF FINANCE AND ECONOMIC PLANNING.(MINICOFIN)

PROJECT NAME:

Construction of multi storeyed Administrative Building for Ministry of Finance and Economic Planning.


 

WORKS COMPLEXITY:

Construction of a multi storeyed Building for administrative offices, in solid concrete blocks and reinforced concrete walls, slabs, columns and beams, parapet walling, aluminium windows and doors. All electro-mechanical works, Lift installation, external boundary walling, parking and landscaping. All painting and decoration works. etc.

 


Location : Kigali - Rwanda

CONSTRUCTION WORKS OF DRINKING WATER SUPPLY SYSTEM MURAMA-RWAMIKO-BUKURE AND MIYOVE-NYAMIYAGA IN GICUMBI DISTRICT

CLIENT

Water And Sanitation Corporation. (WASAC)

PROJECT NAME:

Proposed Construction of Drinking water supply System for Muram-Rwamiko-Bukure and Miyove- Nyamiyaga in Gicumbi District.

 

 

WORKS COMPLEXITY:

Construction of Access road, intakes, receiving tanks, Distribution tanks, chlorination building, pumping station,Distribution of water pipe lines, massive reinforced concrete works. High  tech electro-mechanical works, etc.


Location : GICUMBI DISTRICT

Proposed Execution of Rehabilitation works of Earth Road: Rukali – Kabuga (40.1Km)

 

CLIENT

Nyanza District.

PROJECT NAME:

Proposed Execution of Rehabilitation works of Earth Road: Rukali – Kabuga  (40.1Km)

 

 

WORKS COMPLEXITY:

Clearing of undergrowth and cleaning of the influence, earthwork out of cut and fill, implementation of lateritic wearing course, work of drainage of rain water: side ditches out of ground or masonry, tubes, concrete pipe, pedestrian and vehicular slabs, masonry or gabion retaining walls, reinforcement concrete bridge & box culvert, vertical signalisation.


Location : RUKALI -- KABUGA UNPAVED ROAD WORKS

Giticyinyoni-Ruli-Rushashi-Gakenke road (68.7 km)

 

CLIENT

Gakenke District.  P.O.Box   -Rwanda,

PROJECT NAME:

Contract for Execution works for periodic maintenance works of Giticyinyoni-Ruli-Rushashi-Gakenke road (68.7 km), Sections of DR 47; 48 and 51.

 

 

WORKS COMPLEXITY:

Clearing of undergrowth and cleaning of the influence, earthwork out of cut and fill, implementation of lateritic wearing course, work of drainage of rain water: side ditches out of ground or masonry, tubes, concrete pipe, pedestrian and vehicular slabs, masonry or gabion retaining walls, reinforcement concrete bridge & box culvert, vertical signalisation.


Location : Gakenke District.

Periodic Maintenance Works of Rukomo-Karama Road (18km) in Nyagatare District

 

CLIENT

NYAGATARE DISTRICT.

PROJECT NAME:

Periodic Maintenance works of Rukomo – Karama Road (18Km) in Nyagatare District.

 

 

WORKS COMPLEXITY:

Use of machines like excavators, bulldozers, backhoe, compactors, wheel loaders, asphalt concrete mixing equipment, water tank trucks and dump trucks work of drainage of rain water: side ditches out of ground or masonry, tubes, concrete pipe, pedestrian and vehicular slabs, masonry or gabion retaining walls, reinforcement concrete bridge & box culvert, vertical signalisation.

 

 


Location : Nyagatare District

CONSTRUCTION OF GIHENGELI-NGARAMA-GATSIBO WATER SUPPLY SYSTEM PHASE 1

 

CLIENT

Water And Sanitation Corporation. (WASAC)

PROJECT NAME:

Proposed Construction of Gihengeli – Gatsibo Water Supply System Phase 1.

 

 

WORKS COMPLEXITY:

Construction of intakes, receiving tanks, Distribution tanks, chlorination building, pumping station, Distribution of water pipe lines, massive reinforced concrete works. High  tech electro-mechanical works, etc.

 


Location : GATSIBO DISTRICT

Construction of Giheke-Kamemebe-Nkanka Water supply system

 

CLIENT

Water And Sanitation Corporation. (WASAC)

PROJECT NAME:

Proposed Construction of Giheke – Kamemebe – Nkanka water supply project.

 

 

WORKS COMPLEXITY:

Construction of Access road, intakes, receiving tanks, Distribution tanks, chlorination building, pumping station, 95Km of distribution of water pipe lines, massive reinforced concrete works. High  tech electro-mechanical works, etc.

 


Location : Nyamasheke and Rusizi District, Rwanda

Apex Academy (Phase-I)

CLIENT

REPUBLIC OF RWANDA.

PROJECT NAME:

Construction of the Administrative Block, Classrooms, Dispensary, Male Dormitory etc.

 

 

WORKS COMPLEXITY:

Construction Several Buildings in solid concrete blocks and reinforced concrete walls, slabs, columns and beams, parapet walling, aluminium windows and doors. All electro-mechanical works and landscaping. All painting and decoration works. etc.

 


Location : Eastern Province, Rwanda

Construction of 6 Micro-Hydropower Plants

 

CLIENT

Tianjin Mingshuo Tehnology Development Company Limited (MS-Tech) Tech.

PROJECT NAME:

Micro Hydropower Generation Plant.

 

 

WORKS COMPLEXITY:

Construction of 6 ydropower plants at Locations including Mukungwa II, Janja, Nyabahanga, Nyirabuhombohombo, Nshili I and Gashashi.

 


Location : In various parts of Rwanda

Rwanda Transport Development Agency

 

CLIENT

RWANDA TRANSPORT DEVELOPMENT AGENCY (RTDA)

PROJECT NAME:

Construction of 9.5Km of Asphalt Road.

 

 

WORKS COMPLEXITY:

Use of machines construction of 9.5km asphalt Road i.e.like excavators, bulldozers, backhoe, compactors, wheel loaders, asphalt concrete mixing equipment, water tank trucks and dump trucks work of drainage of rain water:

 


Location : Rulindo District, Rwanda

Rural Water Supply and Distribution Project

CLIENT

TONE ENGINEERING Co. LTD (Japan)

PROJECT NAME:

Construction of 17.563Km of Murram access for Kirehe District in Rural Water Supply Project Phase II

 

 

WORKS COMPLEXITY:

Construction of Murram Access Road, 59Km of pipe, 7 distribution and  Receiving tanks, 47 public tap stands, 4 control houses, 6 Chlorination and 5 intake facilities with 10 break pressure tanks. e.t.c

 


Location : Eastern Province of Rwanda

Execution Works For Periodic Maintenance Of Save-Mamba Unpaved Road In Gisagara District, Southern Province

CLIENT

GISAGARA DISTRICT – SOUTHERN PROVINCE – P.O.BOX 219.

PROJECT NAME:

Periodic Maintenance works of 28.11Km Save-Mamba Road.

 

 

WORKS COMPLEXITY:

Clearing of undergrowth and cleaning of the influence, earthwork out of cut and fill, implementation of lateritic wearing course, work of drainage of rain water: side ditches out of ground or masonry, tubes, concrete pipe, pedestrian and vehicular slabs, masonry or gabion retaining walls, reinforcement concrete bridge & box culvert, vertical signalisation.

 


Location : Gisagara District, Southern Province

Urgent Works for the Deviation from Giswi to Nshili Kivu Tea Factory Unpaved Road (17.912 Km) in Nyaruguru District, Southern Province


CLIENT

RWANDA TRANSPORT DEVELOPMENT AGENCY (RTDA)

PROJECT NAME:

Urgent Works for the Deviation from Giswi to Nshili Kivu Tea Factory Unpaved Road (17.912 Km) in Nyaruguru District, Southern Province

 

 

WORKS COMPLEXITY:

Use of machines like excavators, bulldozers, backhoe, compactors, wheel loaders, asphalt concrete mixing equipment, water tank trucks and dump trucks work of drainage of rain water: side ditches out of ground or masonry, tubes, concrete pipe, pedestrian and vehicular slabs, masonry or gabion retaining walls, reinforcement concrete bridge & box culvert, vertical signalisation.


Location : Nyaruguru District

Execution Works For Periodic Maintenance Of Ndatemwa-Muhura 25.4km Unpaved Road In Gatsibo District

CLIENT

RWANDA TRANSPORT DEVELOPMENT AGENCY (RTDA)

PROJECT NAME:

Execution Works For Periodic Maintenance Of Ndatemwa-Muhura 25.4km Unpaved Road In Gatsibo District

 

 

WORKS COMPLEXITY:

Use of machines like excavators, bulldozers, backhoe, compactors, wheel loaders, asphalt concrete mixing equipment, water tank trucks and dump trucks work of drainage of rain water: side ditches out of ground or masonry, tubes, concrete pipe, pedestrian and vehicular slabs, masonry or gabion retaining walls, reinforcement concrete bridge & box culvert, vertical signalisation.


Location : Gatsibo District

EWSA, P.O. Box 537 KIGALI, Rwanda

CLIENT

EWSA (Energy, Water and Sanitation Authority), Rwanda.

PROJECT NAME:

Construction of reservoir Tanks.

 

 

WORKS COMPLEXITY:

Construction of 2 water reservoir water tanks with combined capacity of 3,500cm, pump house and associated equipment.


Location : Kigali Industrial Park and Kigali Special Economic Zone

Construction of a Chancellery and Residence for the Burundian Embassy in Rwanda.

CLIENT

Government of the Republic of Burundi

PROJECT NAME:

Construction of a Chancellery and Residence for the Burundian Embassy in Rwanda.


 

WORKS COMPLEXITY:

Construction of uniquely storeyed residential house for the Burundi Embassy in Rwanda, in solid concrete blocks and reinforced concrete walls, slabs, columns and beams, parapet walling, aluminium windows and doors. All electro-mechanical works, Telecomunication sysytem works, external boundary walling, parking and landscaping. All painting and decoration works. etc.


Location : Kigali - Rwanda

Civils works related to the 100MW Methane Gas Power Supply Project

 

CLIENT

CONTOUR GLOBAL – Kibuye, Western Province, Rwanda.

PROJECT NAME:

Civil works related to the 100MW methane gas Power Supply Project – Rwanda.

 

 

WORKS COMPLEXITY:

Bulk excavation and rock blasting of more than 100,000cm of material , in preparation of platform for a 100MW methane gas project, construction of a marine landing site and soil erosion protection around the main power plant area.


Location : Kibuye, Western Province, Rwanda

Rehabilitation of Road (8.6 km) from Gakoma to Rukarara

 

CLIENT

RWANDA TRANSPORT DEVELOPMENT AGENCY (RTDA)

PROJECT NAME:

Rehabilitation of road (8.6Km) from Gakoma to Rukarara Hydro Power Project.

 

 

WORKS COMPLEXITY:

Use of machines like excavators, bulldozers, backhoe, compactors, wheel loaders, asphalt concrete mixing equipment, water tank trucks and dump trucks work of drainage of rain water: side ditches out of ground or masonry, tubes, concrete pipe, pedestrian and vehicular slabs, masonry or gabion retaining walls, reinforcement concrete bridge & box culvert, vertical signalisation.

 


Location : Rukarara- Rwanda

PERIODIC MAINTENANCE WORKS OF BURUHUKIRO TEA FACTORY

 

CLIENT

RWANDA TRASNPORT DEVELOPMENT AGENCY.

PROJECT NAME:

Road Maintenance works.

 

 

WORKS COMPLEXITY:

Periodic Maintenance of 18Km   unpaved road and all associated works.


Location : NYAMAGABE DISTRICT

REHABILITATION AND PERIODIC MAINTENANCE WORKS OF ACCESS ROAD TO RUKARARA V/ MUSHISHIRO POWER HOUSE

 

CLIENT

RWANDA TRASNPORT DEVELOPMENT AGENCY.

PROJECT NAME:

Road Maintenance works.

 

 

WORKS COMPLEXITY:

Periodic Maintenance of 8.5Km unpaved road and all associated works.


Location : NYAMAGABE DISTRICT

Construction of Hydroelectric Power Dam on Rukarara River

 

CLIENT

ECO – POWER (GLOBAL) LTD

PROJECT NAME:

CONSTRUCTION OF HYDRO ELECTRIC POWER DAM ON RUKARARA RIVER.

 

 

WORKS COMPLEXITY:

Construction of a dam on Rukarara River, intake, 3.5km of reinforced head race canal, spillway, forebay tank, penstock, power house and access road.

 

 


Location : Gikongoro - Rwanda

Construction of Multi-storeyed Parking Garage for Kigali City Tower)

CLIENT

DOYECYI LIMITED - KIGALI

PROJECT NAME:

MULTI-STOREY PARKING BUIDLING CONSTRUCTION ( KIGALI CITY TOWER)

 

 

WORKS COMPLEXITY:

Construction of 4 storeys parking garage out of RC Frames, Masonry works, aluminum works, timber and steel doors, electrical and mechanical installations including finishing and external works.


Location : Kigali - Rwanda

Periodic Maintenance Works Of Kibeho-Kivu Muganza Tea Factory Unpaved Road (14.214 Km);

CLIENT

RWANDA TRASNPORT DEVELOPMENT AGENCY.

PROJECT NAME:

Road Maintenance works.

 

 

WORKS COMPLEXITY:

Periodic Maintenance of 14.214 Km of unpaved road.

 


Location : Nyaruguru District

Rehabilitation of Republican Guard Housing Facilities

CLIENT

GOVERNMENT OF THE REPUBLIC OF RWANDA.

PROJECT NAME:

REHABILITAION OF THE REPUBLICAN GUARD..

 

 

WORKS COMPLEXITY:

Rehabilitation of Republic Guard Reconstruction of ceiling , walling in dormitory blocks and other civil works, telecommunications, electrical and plumbing works, roads , parking , play grounds and landscaping.


Location : Kigali - Rwanda

Construction of Head Race Canal on Rukarara River

 

CLIENT

ECO – POWER (GLOBAL) LTD

PROJECT NAME:

CONCRETE WORKS CONSTRUCTION.

 

 

WORKS COMPLEXITY:

Construction of Head Race canal for the Hydroelectric power Dam on Rukarara River.


Location : Rikongoro - Rwanda

Construction of a Social Club and Fitness Centre at the President’s Offices, Republic of Rwanda

CLIENT

GOVERNMENT OF THE REPUBLIC OF RWANDA.

PROJECT NAME:

CONSTRUCTION OF SOCIAL CLUB AND FITTNESS CENTRE.

 

 

WORKS COMPLEXITY:

Construction of Social club and Fitness center in two single storey buildings in reinforced concrete, masonry works, finishing works, electrical and plumbing works, air conditioning and fitness center equipment.

 


Location : Kigali - Rwanda
Construction
construction construction

At FAIR CONSTRUCTION we pride ourselves in the Read More...

Ready-Mix Concrete Batching Plant
Ready-Mix Concrete Batching Plant interior

Our batching plant with a dependable capacity Read More...

Stone Quarry
electrical and plumbing electrical

The most modern of crusher machines has been deRead More...

Contact Details
  •          FAIR CONSTRUCTION Ltd.
  •          Plot no 5299, Avenue Des Poids Lourds
  •          B.P-3109, Kigali, Rwanda.
  •     District - Nyarugenge, Sector  - Muhima , Cell - Ubumwe , Village - Amahoro
  •          Tel N° :  (+250) 7 88 309 202
  •          Tel N° :  (+250) 7 88 309 200
  •          E-mail :   fair@fairconstructionrw.com